A Defence Prime contractor building the Harry DeWolf class Arctic Offshore Patrol Ships (AOPS) required qualification testing of ship pipe flange connections used throughout the vessel's critical piping systems. ESL Labs was engaged to develop customized test procedures and execute a comprehensive qualification program to validate the safety, durability, and performance of these connections before the ships entered service.
ESL Lab's Solution
ESL Labs formed an integrated engineering team with the ship Prime Contractor and Classification Society to develop and execute fully customized qualification test procedures. Parallel testing operations were implemented to maximize throughput and meet the compressed schedule without compromising test integrity.
All testing was conducted at ESL’s Dartmouth, Nova Scotia facility. Our team developed the test procedures in partnership with the Prime and classifier, executed 150% pressure pulsation shock, 400% burst pressure, and 10 million cycles of vibration and flexing across dozens of pipe flange connection types, and provided comprehensive qualification reporting fully compliant with ship classifier specifications.
The result was a successful qualification of all required pipe flange connection types, enabling the HMCS Harry DeWolf — the first Arctic Offshore Patrol Ship in its class — to be delivered to the Royal Canadian Navy in July 2020.